Seymour ConcreteSeymour Concrete

Concrete sidewalk building in Seymour IN - a walk that drains and stands up to winter

Is your sidewalk heaving, cracking or holding puddles? We dig out, slope and pour a new walk built for Indiana freezes and thaws.

A stamped concrete walkway runs between open wooden gates, a tall fence, and the beige siding of a house.
  • Fully licensed and insured.
  • Free quotes on site.
  • We reply within 1 business day.

What's involved in tearing out and building a new concrete sidewalk?

Concrete sidewalk building in Seymour, IN means laying out the walk, digging out and packing the base it sits on, setting forms with enough slope to shed water, then pouring, finishing and curing the slab. It often starts with breaking out an old, broken walk, and it can tie into steps, a curb or a driveway.

Most people call when the old walk has heaved or cracked into a trip hazard, or when they're tired of a muddy path where a walk should be. The price mostly turns on how long and wide the walk is, whether an old one has to be broken out and hauled off, and how much digging the base needs. The schedule turns on the weather, since rain stops a pour and cool days stretch out curing, and on the permit, because before we schedule I check with the city or county office that covers your property and tell you plainly who'll take care of the paperwork. My written estimate puts your own figure on all of that and says what's included.

How do you know your sidewalk needs replacing?

  • Sections that tip or sink

    One slab sits higher than the next, or a corner has dropped. That usually means the ground underneath settled or washed out, and the edge tends to get worse each winter until it catches someone's toe.

  • Water sitting after rain

    Puddles that hang around on the walk mean it has lost its slope or never had any. That standing water is hard on the surface every time it freezes, so the top starts to wear and flake.

  • Cracks and broken edges

    Wide cracks, chunks missing at the edges or pieces that rock underfoot are hard to fix with patching. A broken walk lets more water get under the slabs, so the damage tends to spread to the next section.

  • Garage floor concrete

    When the walk ends at a garage whose floor is cracked, pitted or sloping wrong, redoing both at once keeps the concrete matching and the edges tight.

  • Decorative concrete

    If you want the front walk to look like more than plain gray, color, stamped patterns or a border can dress up the stretch guests see first.

How we build a concrete sidewalk

I mark where the walk runs and check where rainwater goes, then we break out any old concrete and dig down to firm ground. We pack a gravel base on the subgrade, the soil the walk sits on, because a base that's only raked level settles with the dirt and takes the slab down with it. We set the forms with a slight fall so water runs off the walk instead of sitting on it, and away from the house, and we order air in the mix for any walk that freezes. We pour early in the day, since midday heat can leave a weak, dusty top, then give it a broom finish, a light texture that gives your shoes grip when it's wet. We cut control joints, shallow grooves that tell the slab where to crack so it doesn't pick its own spot, and then it cures. If the budget gets tight, the base is the last place I'd cut, because nobody sees it on day one and it decides whether the walk is still flat a few winters later.

A new walk often ties into other work. If it runs to a garage with a cracked or sunken floor, we can pour new garage floor concrete while the crew is already here, and if you'd like color or a pattern where the walk meets the porch or patio, ask about decorative concrete. If you're rebuilding an old sidewalk in Seymour, I'll point you to the city's shared cost program before you decide.

  • A brand-new walk

    This suits a house with a worn path through the grass or a new addition that needs a way in. We lay it out with you so it goes where people actually walk and the water has somewhere to go.

  • Tear-out and rebuild

    This suits an old walk that has heaved, sunk or broken up. We break it out, haul it off and look at what's underneath, because why the old one failed usually tells us what the new base needs.

Get a written estimate for your concrete sidewalk

Send the form and we'll reply within one business day to set a time. I'll walk the job with you for free, with no obligation, or you can call (812) 271-8146 instead.

Call (812) 271-8146

Why Seymour homeowners call Seymour Concrete for sidewalks

  • I write your estimate myself

    I come out to look at the job, answer your questions and write the estimate, and our crew of experienced finishers does the work with me on site. The person who quoted your walk is the one watching it get built.

  • Started here in Seymour, 2017

    I opened this business in Seymour in 2017 after years of summers on concrete crews, and careful flatwork like walks, driveways, patios and steps is what we're known for. We work across the cities around it too, including Columbus, North Vernon, Scottsburg and Salem.

  • Fully licensed and insured, every job

    Seymour Concrete is fully licensed and insured. Whoever you hire for a walk, ask to see that before anyone sets a form on your property.

On a sidewalk, what lasts is mostly what you can't see once it's poured, so ask every contractor how they'll build the base and set the slope. When you're ready, tell us about your walk or call (812) 271-8146.

What happens after you call about a sidewalk in Seymour?

  1. Call and set a visit

    When you call (812) 271-8146 or send the form, I ask a few questions about the walk and set a time to come see it with you. Our hours run from early morning into the evening every day of the week.

  2. Walk the site together

    I walk the line of the sidewalk with you, look at where the water runs and talk through your options. Then I send a written estimate that spells out the tear-out, base and finish, so you know what you're paying for before you decide.

  3. Form, pour and finish

    Once you say go, I'm on site with the crew from setting forms to the final finish. Keep cars, bikes and kids off the fresh concrete until I tell you it's ready.

  4. Look it over together

    We look over the new sidewalk together before we leave, and I go over how long to stay off it and how to treat it the first winter. Your satisfaction, guaranteed.

Common questions

  • Do I need a permit to build or replace a sidewalk in Seymour, IN?

    Yes. The city's Planning and Zoning Department issues building permits for all construction in Seymour and the two-mile area around it, and that includes replacing an existing sidewalk. Projects need the Building Commissioner's approval, and the department inspects the work for compliance with state codes.

  • Will the city of Seymour help pay to rebuild my sidewalk?

    It can. Through its Shared Cost Sidewalk and Curb Program, Seymour reimburses $4 per square foot of rebuilt residential sidewalk and $25 per linear foot of curb, and you pay the rest. There's no deadline to apply, but yearly funding limits how many requests the city approves, and not-for-profit groups may qualify too.

  • How much does a new concrete sidewalk cost in Seymour?

    The price is set mostly by the walk's length and width, whether an old walk comes out first, and how much base work the ground needs. Steps or a curb tie-in add to it, and a plain broom finish costs less than color or a pattern. If you're rebuilding an old walk in town, the city's shared cost program can pay some of it back.

  • How long does a new concrete sidewalk take to cure?

    Ohio Concrete, in guidance written for Ohio, advises curing right after finishing for at least 7 days, and longer when it's cooler. So a walk poured in the fall takes longer to be done than one poured in early summer, and I'll tell you when yours is ready to use.

  • Can I put salt on a new concrete sidewalk the first winter?

    It's better not to. Ohio Concrete advises against deicing salt in the first year after the pour, especially on concrete placed after September. Sand or kitty litter gives you traction instead, so keep a bucket by the door if your walk goes in late in the year.

  • How do I keep a concrete sidewalk from flaking in the winter?

    Start with a mix that has air in it, since federal highway guidance explains that tiny, evenly spread air bubbles give the pressure from freezing somewhere to go. After that, Ohio Concrete recommends cleaning the walk and putting on a commercial penetrating sealer every 3 to 5 years, following the sealer maker's directions. If a little flaking shows up anyway, it's usually only on the surface and the slab underneath stays sound, so it may not need repair.

Get an estimate for your new sidewalk

Have the walk's location, its rough length and whether it replaces an old sidewalk handy, and the first call will tell me most of what I need.

(812) 271-8146Request a quote